De-scaling Tower Fill       Safely and effectively remove all deposits from the tower fill.     

Deposits in the tower fill will reduce the cooling tower efficiency and diminish the life expectancy of the tower fill.

Scale deposits can be removed without damaging the plastic tower fill.

                                  BEFORE                                                                                            AFTER   


AGI International Inc.

      Water & Chemical Management

De-scale tower hot basins and cool basins removing scale and corrosion.

Safe de-scaling solution effectively removes all deposits from the cooling tower hot basin, cool basin, and walls.

                                          BEFORE                                                                                                          AFTER  

Zero Bleed Water Conservation Program

The AGI Zero Bleed Water Conservation Program will save you over 1 million gallons of water per year per 500 tons of cooling.

This program incorporates filters and softeners to remove the scaling tendency's of the tower water and eliminates the bleed-off.

This program will also clean and remove old deposits that are in the tower and condenser piping system slowly de-scaling the sysystem.